Rendered at 09:06:33 08/14/25
Free Shipping
Inage Bathroom Faucet With Pop Up Drain Waterfall Single Handle Faucet Bathroom
$38.99
Shipping options
Estimated to arrive by Fri, Aug 22nd.
Details
FREE via Standard shipping (1 to 5 business days) to United States
Offer policy
OBO - Seller accepts offers on this item.
Details
Return policy
Full refund available within 30 days
Purchase protection
Payment options
PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted
Shipping options
Estimated to arrive by Fri, Aug 22nd.
Details
FREE via Standard shipping (1 to 5 business days) to United States
Offer policy
OBO - Seller accepts offers on this item.
Details
Return policy
Full refund available within 30 days
Purchase protection
Payment options
PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted
Item traits
Category: | |
---|---|
Quantity Available: |
3 in stock |
Condition: |
New |
UPC: |
713837130030 |
Brand: |
INAGE |
Finish: |
Brushed |
Color: |
Brushed Gold |
Mounting Type: |
Deck Mount |
Finish Type: |
Brushed |
Number Of Handles: |
1 |
Included Components: |
Drain, Installation Hardware, Instruction Manual |
Handle Type: |
Lever |
Installation Method: |
Centerset |
Item Dimensions Lx Wx H: |
14.5 X 9 X 3.1 Inches |
Model Name: |
In51602 |
Handle Material: |
Brass |
Item Weight: |
5.99 Pounds |
Product Dimensions: |
14.5 X 9 X 3.1 Inches |
Item Model Number: |
In51602 |
Listing details
Seller policies: | |
---|---|
Posted for sale: |
More than a week ago |
Item number: |
1599308640 |
Item description
Contact Us Add to Favorite
Welcome to
Elegant Wings
Contact Us Add to Favorite
Fast Shipping
Hassle Free Return
Money Back Guarantee
Authenticity Guarantee
Inage Bathroom Faucet With Pop Up Drain Waterfall Single Handle Faucet Bathroom
Item Description
?Durable Material?- Lead-free solid brass construction for superior rust resistance, copper metal single handle, touchscreen RV sink faucet for durability and safety! Ceramic spool reduces leak points,water-saving and cost-effective. ?Easy DIY to Install?- The bathrrom faucet comes with all the accessories including deck plate and pop up drain. Designed to easily install with standard U.S. plumbing connections and clearly listing the installation size information, you can install with confidence.You can also save PLUMBING INSTALLTION FEE. You can install with confidence. ?Waterfall Spout?- The bathroom faucet spout provides a visually pleasing waterfall of water like a stream, which helps create a serene bathroom environment. ?Single Handle Design?- Single handle design for effortless flow and temperature control. Pop up drain comes with the single hand faucet. ?100% Satisfaction Service?- We offer 24-hour customer service and 30-day unconditional returns. We provide you with the best products and services. If there is any problem with the product, please feel free to let us know and we will fix it for you.
About us
Customer service is our top priority! Please be sure to read the description thoroughly to make sure that this is the item you want before making a purchasing decision. If you have any questions about this item, please contact us via messages before placing your order. We make every effort possible to accurately describe and depict the items. Please be aware that slight variations in color may be due to differences in lighting and computer monitor resolutions. All items are in stock at the time of listing however, in the unlikely and unforeseen event that we are unable to fulfill your order through any of our networked warehouses, we will notify you as quickly as possible and offer you a 100% refund on your purchase. Thank you for shopping with us. We appreciate your business! B0BPBR8T97
Payment
PayPal is our preferred method of payment. If you do not have a PayPal account, all major credit cards are gladly accepted through PayPal as the payment processor. PayPal offers great buyer and seller protection. Your order will be processed pending receipt of cleared payment through PayPal. Sales tax may be charged depending on your location.
Shipping
We provide fast, free shipping. Most items are shipped within 3-5 business days of receiving cleared payment. We ship to the lower 48 contiguous United States only. We do not ship to P.O. Boxes or APOs. Standard Shipping is ALWAYS FREE! You will be notified via messages as soon as your items ship. Special Notice for Freight Items: If an item ships via Freight (Truck) Delivery, a valid phone number will be required so that we can contact you to schedule delivery. The item may be delivered with curbside delivery. An adult signature will be required. Please be sure to have available help on hand to assist you with moving the item to the desired location in or outside of your home. Freight items must be inspected upon delivery. In the unlikely event that damaged is observed, you MUST refuse delivery and note the damage on the shipping receipt and send it back via the Freight carrier. Returns will not be accepted on Freight items after they have been delivered, inspected, and the driver has left the premises.
Returns
We offer a 30 day return/exchange policy for most of our products. You can request a refund if you are dissatisfied for any reason with your product. (Restocking Fee May Apply). Only factory defects are accepted as a reason for a return. In the case of factory defects, if available, we will replace the product for you. When returning an item, it must be in all of the original packaging and include all of the original accessories or items that came with it. The item and package should be in original and perfect condition. You will be required to cover shipping on the return of non-defective items. All returns MUST be done within 30 days of date of purchase. Please note that we cannot give refunds or replacements after the 30 day limit has expired. When sending in a return, please note that it can take up to 7 business days for the return to be processed. We do our best to process as quickly as possible. We are extremely fair, and in the rare event of something out of the ordinary happening with our products or shipping, we will gladly work with you to find a fair resolution.
Added to your wish list!

- Inage Bathroom Faucet With Pop Up Drain Waterfall Single Handle Faucet Bathroom
- 3 in stock
- Price negotiable
- Handling time 3 days. Estimated delivery: Fri, Aug 22nd
- Returns/refunds accepted
Get an item reminder
We'll email you a link to your item now and follow up with a single reminder (if you'd like one). That's it! No spam, no hassle.
Already have an account?
Log in and add this item to your wish list.